When each fixing is struck.
This page belongs to a retired product. ETP Foundry no longer sets official prices for tokens. It is now a toolkit for launching and running tokenised funds on Canton, where asset prices come from existing providers such as Chainlink and Kaiko. The schedule below is kept for the record. How it works →
Crypto on Canton trades every day, so a crypto fixing is struck every day, weekends included. A tokenised stock is struck at its home market’s close on that market’s trading days.
Loading schedule…
Strike schedule
| Benchmark | Session | Strike | Days | Next strike |
|---|---|---|---|---|
| Loading… | ||||
Crypto (cBTC, cETH): 16:00 London every day, adopted 28 September 2026, over the 60 minutes before it; records made before that date were struck at 16:00 UTC and stay as they were. Tokenised US stocks, or a basket holding one: 16:00 New York on NYSE trading days. The table above is read from the desk’s schedule. Methodology v1.1 governs.
What a holiday changes
| Day | Underlying reference (e.g. CME CF BRR) | What we publish |
|---|---|---|
| Weekday, venues open | published | The committee fixing (tier 0 until the four §6.4 conditions hold, then tier 1). If the committee does not reach K: tier 3 (reference × par) only with a licensed reference, of which there is none today; otherwise tier 4 (the prior committee value, flagged) or tier 5, NO FIXING |
| Weekend | published (the CF rates are daily) | same as a weekday; a venue whose book had no trades reports zero trades (and its quotes, if it quoted), and the fixing falls to the next input level, labelled |
| Reference administrator holiday | not published | tier 3 unavailable (as it is today, with no licensed reference); tier 4 carries the prior committee fixing, flagged; tier 5 publishes a gap if nothing can be carried |
| Underlying market closed (tokenised equities) | closed | no OFFICIAL fixing until the underlying reopens; the last OFFICIAL value stays visible with its age. OFF-HOURS SIGNED fixings (specified, not built) cover the gap for margin use once attested |
Notice periods you can plan around
- Methodology change: a material change needs a public consultation of at least 30 days, then at least 30 days' notice before it takes effect (methodology §9). Non-material clarifications take effect on publication. Never retroactive: a fixing is read under the version in force at its strike.
- Corrections: a correction needs the same signers as the original and never deletes it (methodology).
- Cessation: 60 calendar days' notice, enforced on-ledger (
CessationNotice). - Oversight function: not constituted yet (methodology §9). The committee of seats is not an oversight function. Until one exists, the administrator performs the reviews, publishes them, and says that it does so. First annual review due by 30 September 2027.
- Quarterly error table: published within 15 business days of quarter end, from the first quarter with a published fixing.
Times are shown in the zone stated beside them. The authoritative schedule is the one served by
/api/benchmarks (publishTime, timezone); this page reads it on load.